|
IZIN REKLAME | ||
| A.Dasar Hukum | ||
| ||
| B.Persyaratan | ||
| ||
| C.Mekanisme | ||
| ||
|
D. Lamanya pemprosesan : | ||
| ||
| E. Perhitungan Hasil Nilai Sewa Reklame | ||
|
No. |
Jenis |
Masa Pajak |
Nilai Jual Obyek Pajak Reklame (NJOR) | ||||
|
Harga Dasar Ukuran Reklame (Rp/ m2) |
Harga Dasar Ketinggian | ||||||
| - | - | - |
< 10 |
10 - 50 |
> 50 |
Satuan |
- |
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
|
1 |
Megatron/Videotron/LED |
- |
- |
- |
- |
- | - |
|
- |
|
PerTahun |
1.500.000 |
2.000.000 |
2.500.000 |
/m2 |
200.000.00/m |
|
- |
|
- |
- |
- |
- |
- |
- |
|
- |
|
PerTahun |
2.000.000 |
2.500.000 |
3.000.000 |
/m2 |
200.000.00/m |
|
- |
|
PerTahun |
1.000.000 |
1.500.000 |
2.000.000 |
/m2 |
200.000.00/m |
|
2 |
Billboard/papan |
- |
- |
- |
- |
- |
- |
|
- |
|
Per Tahun |
1.500.000 |
2.000.000 |
2.500.000 |
/m2 |
100.000.00/m |
|
- |
|
Per Tahun |
750.000 |
1.000.000 |
1.250.000 |
/m2 |
100.000.00/m |
|
- |
|
Per Hari |
5.000 |
5.000 |
- |
/m2 |
- |
|
3 |
Kain/Spanduk/ Umbul-umbul/Banner |
Per Hari |
3.000 |
3.000 |
- |
/m2 |
- |
|
4 |
Selebaran/Brosur/ Leafleat |
Per Penyelenggara |
- |
- |
3.000 |
/Lembar Folio |
- |
|
5 |
Berjalan |
Per Tahun |
- |
- |
3.500.000 |
/m2 |
- |
|
6 |
Melekat |
- |
- |
- |
- |
- |
- |
|
- |
|
Per Bulan |
- |
- |
25 |
/cm2 |
100.000.00/m |
|
- |
|
Per Bulan |
20.000 |
- |
- |
- |
100.000.00/m |
|
7 |
Udara/Balon |
- |
- |
- |
3.000.000 |
/Buah |
- |
|
8 |
Suara |
- |
- |
- |
- |
- |
- |
|
- |
|
Per Tahun |
- |
- |
20.000 |
/Lokasi |
- |
|
- |
|
Per Penyelenggara |
- |
- |
10.000 |
/Lokasi |
-- |
|
9 |
Film/Slide |
- |
- |
- |
1.000 |
/10 dtk |
- |
|
10 |
Peragaan |
- |
- |
- |
- |
- |
- |
|
- |
|
- |
- |
- |
50.000 |
/Lokasi |
- |
| - |
|
- |
- |
- |
30.000 |
/Lokasi |
- |
|
Nilai Strategi Pemasangan Reklame (NSPR) | |||||
|
Fungsi Ruang |
Fungsi Jalan |
Sudut Pandang | |||
|
Bobot = 60% |
Skor |
Bobot = 15% |
Skor |
Bobot = 25% |
Skor |
|
9 |
10 |
11 |
12 |
13 |
14 |
|
Kawasan Khusus |
- | Arteri Primer/ Jalan Nasional |
10 | 4 arah | 10 |
|
Kawasan Selektif |
- | - | - | - | - |
|
Kawasan Umum |
10 | Arteri Sekunder/ Jalan Propins |
8 | 3 arah | 8 |
|
- | - | - | - | - |
|
- | - | - | - | - |
|
Kawasan Umum |
6 | Kolektor- | 6 | 2 arah | 4 |
|
- | - | - | - | - |
|
- | - | - | - | - |
|
Kawasan Umum |
2 | Lokasi/Lingkungan | 4 | 1 arah | 2 |
|
- | - | - | - | - |
|
- | - | - | - | - |
|
|
|
|
|
|
|
|
|
|
Minggu, 19 Mei 2013
15:10:42
Statistik Pengunjung
Online: 305
Total: 8.954.947